Browse by Year
/ 2009
/ June
/ Thursday, June 25, 2009
[Federal Register: June 25, 2009 (Volume 74, Number 121)]
[Rules and Regulations]
[Page 30224]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr25jn09-7]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2009-0486]
Drawbridge Operation Regulations; Passaic River, NJTRO Bridge,
Harrison, NJ, Maintenance
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
New Jersey Transit Rail Operations (NJTRO) Newark-Harrison Bridge
across the Passaic River, mile 5.8, at Harrison, New Jersey. The
deviation is necessary to facilitate mechanical rehabilitation at the
bridge. The deviation allows the bridge to remain in the closed
position for four months. A two week advance notice for bridge openings
will be required during the four months of construction.
DATES: This deviation is effective from July 20, 2009 through November
20, 2009.
ADDRESSES: Documents mentioned in this preamble as being available in
the docket are part of docket USCG-2009-0486 and are available online
at http://www.regulations.gov, selecting the Advanced Docket Search
option on the right side of the screen, inserting USCG-2009-0001 in the
docket ID box, pressing enter, and then clicking on the item in the
Docket ID column. This material is also available for inspection or
copying at the Docket Management Facility (M-30), U.S. Department of
Transportation, West Building Ground Floor, Room W12-140, 1200 New
Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this rule,
call or e-mail Mr. Joe Arca, Project Officer, First Coast Guard
District, telephone (212) 668-7165, joe.m.arca@uscg.mil. If you have
questions on viewing the docket, call Renee V. Wright, Program Manager,
Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION:
The owner of the bridge, New Jersey Transit Rail Operation,
requested this temporary deviation to facilitate mechanical and
structural rehabilitation construction at the bridge. The NJTRO Bridge
across the Passaic River at mile 5.8, at Harrison, New Jersey, has a
vertical clearance in the closed position of 15 feet at mean high water
and 20 feet at mean low water. The Drawbridge Operation Regulations are
listed at 33 CFR 117.739(g).
Under this temporary deviation the NJTRO Bridge may remain in the
closed position for four months from July 20, 2009 through November 20,
2009, to facilitate rehabilitation construction at the bridge. The
bridge shall open for vessel traffic upon two weeks notice by calling
Mr. Harold Mullcavey, at 732-620-5354 during daytime business hours, 7
a.m. to 5 p.m., Monday through Friday. Vessels able to pass under the
closed draw may do so at any time.
In accordance with 33 CFR 117.35(e), the bridge must return to its
regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: June 11, 2009.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. E9-14944 Filed 6-24-09; 8:45 am]
BILLING CODE 4910-15-P
Browse by Year
/ 2009
/ June
/ Thursday, June 25, 2009
|
|