Federal Register Search  
   Home |  FREE Email Alerts (NEW!) |  1998 |  1999 |  2000 |  2001 |  2002 |  2003 |  2004 |  2005 |  2006 |  2007 |  2008

Browse by Year / 2008 / July / Tuesday, July 15, 2008
[Federal Register: July 15, 2008 (Volume 73, Number 136)]
[Notices]               
[Page 40560-40561]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr15jy08-36]                         

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13228-000]

 
Wellesley Rosewood Maynard Mills LP; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comment, Motions To 
Intervene, and Competing Applications

July 9, 2008.
    On May 19, 2008, Wellesley Rosewood Maynard Mills LP filed an 
application, pursuant to section 4(f) of the Federal Power Act, 
proposing to study the feasibility of the Clock Tower Place 
Hydroelectric Project, to be located on the Assabet River in the 
Maynard area of Middlesex County, Massachusetts.
    The proposed project would consist of: (1) Two existing dams, the 
larger constructed of dry-laid, cut granite blocks, 9.5-foot-high and 
170-foot-long and the smaller a masonry-faced embankment structure, 
respectively, for the upper and lower reservoirs which would have water 
surface elevations of 177 and 176 feet, MSL, a (2) proposed powerhouse 
containing one generating unit having a total installed capacity of 290 
kilowatts, a (3) proposed 49-foot-long penstock and twin 300-foot-long 
tailrace tunnels, a (4) 1,600-foot-long power canal leading to the 
gatehouse, (5) incorporation of an existing transformer to interconnect 
equipment with Clock Tower Place at 208y/120 volts, and (5) appurtenant 
facilities. The project would have an annual energy generation of 
1,241,000 kWh per year.
    Applicant Contact: Mr. Robert Buonato, President, Wellesley 
Rosewood Maynard Mills LLC, 12 Clock Tower Place, Suite 200, Maynard, 
MA 01754; phone: 978-823-8224. FERC Contact: Alyssa Dorval, 202-502-
6735.

[[Page 40561]]

    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Comments, motions to intervene, notices of intent, and competing 
applications may be filed electronically via the Internet. See 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's website 
under the ``e-Filing'' link. If unable to be filed electronically, 
documents may be paper-filed. To paper-file, an original and eight 
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For 
more information on how to submit these types of filings please go to 
the Commission's Web site located at http://www.ferc.gov/filing-
comments.asp. More information about this project can be viewed or 
printed on the ``eLibrary'' link of Commission's Web site at http://
www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
13228) in the docket number field to access the document. For 
assistance, call toll-free 1-866-208-3372.

Kimberly D. Bose,
Secretary.
[FR Doc. E8-16207 Filed 7-14-08; 8:45 am]

BILLING CODE 6717-01-P

Browse by Year / 2008 / July / Tuesday, July 15, 2008
Search

Recent Registers
November 20, 2008
November 19, 2008
November 18, 2008
November 17, 2008
November 14, 2008
November 13, 2008
November 12, 2008
November 10, 2008

  Home |  Contact Us |  Links
All contents © 2000 - 2009 Web Doodle, LLC. All rights reserved.
Web Doodle, LLC does not provide legal advise.