Federal Register Search  
   Home |  FREE Email Alerts (NEW!) |  1998 |  1999 |  2000 |  2001 |  2002 |  2003 |  2004 |  2005 |  2006 |  2007 |  2008 |  2009 |  2010

Browse by Year / 2008 / November / Friday, November 28, 2008
[Federal Register: November 28, 2008 (Volume 73, Number 230)]
[Notices]               
[Page 72477-72478]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr28no08-70]                         

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-8587-9]

 
Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-1399 or http://www.epa.gov/compliance/nepa/.

Weekly Receipt of Environmental Impact Statements
Filed 11/17/2008 Through 11/21/2008
Pursuant to 40 CFR 1506.9.

EIS No. 20080474, Draft EIS, NPS, VA, Cedar Creek and Bella Grove 
National Historical Park, General Management Plan, Implementation, 
Frederick, Shenandoah, Warren Counties, VA, Comment Period Ends: 02/26/
2009, Contact: Christopher J. Stubbs 540-868-9176.
EIS No. 20080475, Draft Supplement, FHW, CA, Schuyler Heim Bridge 
Replacement and SR-47 Expressway Improvement Project, New Information 
related to Health Risk Associated with Air Toxics, Funding, U.S. Coast 
Guard Bridge Permit, U.S. Army COE Section 10 and 404 Permits, Ports of 
Long Beach and Los Angeles, Los Angeles County, CA, Comment Period 
Ends: 01/12/2009, Contact: Karl Price 213-897-1839.
EIS No. 20080476, Final EIS, COE, 00, White River Minimum Flood Study, 
To Provide an Improved Minimum Flow for the Benefit of the Tail Water 
Fishery, White River Basin Lakes: Beaver, Table Rock, and Bull Shoal 
Lakes on the White River; Norfork Lake on the North Fork White River; 
and Greens Ferry Lake on the Little Red River, AR and MO, Wait Period 
Ends: 12/29/2008, Contact: Mike Biggs 501-324-7342.
EIS No. 20080477, Draft EIS, FTA, MA, Urban Ring Corridor--Phase 2 
Project, Circumferential Transportation Improvements, Proposed Major 
New Bus Rapid Transit, Funding and Right-of-Way Permit, Located in the 
Municipalities of Boston, Brookline, Cambridge, Chelsea, Everett, 
Medford and Somerville, MA, Comment Period Ends: 02/09/2009, Contact: 
Mary Beth Mello 617-494-2055.
EIS No. 20080478, Final Supplement, COE, CA, Pacific Los Angeles Marine 
Terminal, Pier 400 Berth 408 Project, Construction and Operation of a 
new Marine Terminal, U.S. Army COE Section 10 and 404 Permits, Port of 
Los Angeles, Los Angeles County, CA, Wait Period Ends: 12/29/2008, 
Contact: Dr. Spencer D. MacNeil 805-585-2152.
EIS No. 20080479, Draft EIS, FHW, UT, Geneva Road, Center Street/1600 
West (Provo) to Geneva Road/SR-89 (Pleasant Grove), Improvements, U.S. 
Army COE 404 Permit, Utah County, UT, Comment Period Ends: 01/22/2009, 
Contact: Bryan Dillon 801-963-0182.
EIS No. 20080480, Draft EIS, USN, NJ, Laurelwood Housing Area, Access 
at Naval Weapons Station Earle, Lease Agreement, Monmouth County, NJ, 
Comment Period Ends: 01/12/2009, Contact: Kim Joyner-Barty 757-322-
8473.
EIS No. 20080481, Draft EIS, NOA, CA, Southwest Fisheries Science 
Center Replacement, Construction and Operation, located on University 
of California, San Diego Scripps Institute of Oceanography Campus, 
LaJolla, CA, Comment Period Ends: 01/12/2009, Contact: Mark Eberling 
206-526-6477.
EIS No. 20080482, Final EIS, DOE, 00, PROGRAMMATIC--Designation of 
Energy Corridors in 11 Western States, Preferred Location of Future 
Oil, Gas, and Hydrogen Pipelines and Electricity Transmission and 
Distribution Facilities on Federal Land, AZ, CA, CO, ID, MT, NV, NM, 
UT, WA and WY, Wait Period Ends: 12/29/2008, Contact: LaVerne Kyriss 
202-586-1056. Department of Energy and the Department of the Interior/
Bureau of Land Management are Joint Lead Agencies on this project.
EIS No. 20080483, Final EIS, FHW, MO, MO-34 Improvement, from U.S. 
Routes 60/21 Intersection in Carter County to Routes 34/72 Intersection 
in Cape Girardeau County, Funding, U.S. Army COE Section 404 Permit, 
Carter, Bollinger, Reynolds, Wayne, and Cape Girardeau Counties, MO, 
Wait Period Ends: 12/30/2008, Contact: Peggy Casey 573-636-7104.

[[Page 72478]]

Amended Notices

EIS No. 20080405, Draft Supplement, COE, LA, Inner Harbor Navigation 
Canal (IHNC) Lock Replacement Project, Proposal for Relieving 
Navigation Traffic Congestion Associated with IHNC Lock, Located 
between the St. Claude Avenue and North Claibone Avenue Bridge, 
Orleans, LA, Comment Period Ends: 01/24/2009, Contact: Richard E. Boe 
504-862-1505. Revision of FR Notice Published on 10/10/2008; Extending 
Comment Period from 11/25/2008 to 01/24/2009.

    Dated: November 24, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E8-28313 Filed 11-26-08; 8:45 am]

BILLING CODE 6560-50-P

Browse by Year / 2008 / November / Friday, November 28, 2008
Search

Recent Registers
March 19, 2010
March 18, 2010
March 17, 2010
March 16, 2010
March 15, 2010
March 12, 2010
March 11, 2010
March 10, 2010
March 9, 2010

  Home |  Contact Us |  Links
Use of this site constitutes acceptance of our Terms of Service and Privacy Policy. All contents © 2000 - 2011 Web Doodle, LLC. All rights reserved.
Web Doodle, LLC does not provide legal advise.